KENR8601 79
Troubleshooting Section
Repair: The ATB+ has failed. Replace the
ATB+. Refer to Testing and Adjusting Section,
“EMCP Electronic Control (AC Transformer Box)
-Replace”.
STOP.
Te st Step 6. CHECK THE INPUTS OF THE
ATB+
A. Rem o ve the three fuses on the ATB+: F 11, F12,
and F13
B. At the terminal of the ATB+, measure the
resistance between the following terminals:
terminal T11 to terminal H21, terminal T12 to
terminal H21, and terminal T13 to terminal H21
Expected Result:
Each of the resistance m easurements should b e
1,050 ± 100 Ohms.
Results:
•
OK – Each of the resistance measurements is
1,050 ± 100 Ohms.
Repair: The GSC+P may have failed. It is unlikely
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set) - Replace”.
STOP.
•
NOT OK – One or more of the resistance
measurements was NOT 1,050 ± 100 Ohms.
Repair: The ATB+ has failed. Replace the
ATB+. Refer to Testing and Adjusting Section,
“EMCP Electronic Control (AC Transformer Box)
-Replace”.
STOP.
Test Step 7. CHECK THE CURRENT
TRANSFORMERS
A. Shut down the engine.
B. At terminals 51, 52, and 53 of the ATB+,
disconnect only the wires that lead away from
the ATB+. These disconnected wires go to the
current transformers. These current transformers
are CT1, CT2, and CT3.
C. Measure the resistance from terminal 50 to each
of the disconnected wires.
Expected Result:
Theresistanceshouldbeapproximately5Ohms.
Results:
•
OK – The resistances are approximately 5 Ohms.
Therefore, the current transformers are good.
Proceed to Test Step 8.
•
NOT OK – One o r more of the resistance
measurements are NOT correct. A related current
transformer or related wire is open.
Repair: Replace the open current transformer or
repair the wiring. Refer to the Generator Set Wiring
Diagram in Testing And Adjusting, “Schematics
And Wiring Diagrams”.
STOP.
Test Step 8. CHECK THE OU T PU TS OF
THE ATB+
A. Shut down the engine.
B. Remove the harness connector from the GSC+P.
C. At the harness connector of the GSC+P, measure
the resistance between the following contacts:
contact 4 to contact 16, contact 5 to contact 16,
and contact 6 to contact 16. Be sure to allow each
measurement to stabilize.
Expected Result:
Each of the three resistances should be 120 ± 20
Ohms.
Results:
•
OK – Each of the three resistances is 120 ± 20
Ohms. Proceed to Test Step 10.
•
NOT OK – One o r more of the resistance
measurements are NOT correct. Proceed to Test
Step 9.
Test Step 9. CHECK THE GSC+P
HARNESS CONNECTOR
A. Remove the G SC+P harness from the ATB+.
B. Check the resistance of the wires in the GSC+P
harness for an open wire. Refer to the Generator
Set Wirin g Diagram in Tes tin g And Adjusting,
“Schematics And Wiring Diagrams”.
Expected Result:
The w ires in the GSC+P harness should measure
less than 5 Ohms.