146 KENR8601
Troubleshooting Section
Repair: The GSC+P may have failed. It is unlikely
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set) - Replace”.
STOP.
i02890905
GSC CID 1167 - FMI 04
SMCS Code: 1420-035
Conditions Which Generate This Code:
The circuit breaker sensor is used by the GSC+P to
determine if the generator circuit is opened or closed.
When the circuit breaker sensor input is inactive
the input will float to approximately 10.5 DCV. An
inactive state will indicate that the circuit breaker is
open. When the circuit breaker sensor input is active,
the voltage level will be at the level of the negative
battery terminal “BATT-”. An active state indicates
that the breaker is closed.
ThepossiblecauseofaCID1167FMI4isashort
from the input signal of the circuit breaker sensor to
“BATT-”.
A C ID 1167 FMI 04 is detected when the input of the
circuit breaker sensor is active. The CID 1167 F MI
04 indicates a closed breaker and one or both of the
following items are true.
•
The difference of frequency between the generator
and the bus is greater than 0.2 Hz.
•
The difference of phase between the generator
and the bus is greater than 10°.
When the above conditions are present for two
seconds, the GSC+P will issueaCID1167FMI4
as an alarm fault. The GSC+P will then stop the
synchronizatio n process until th e diagnostic code is
cleared and the diagnostic code is corrected.
Te st Step 1. CHECK THE INACTIVE
VOLTAGE LEV EL OF THE CIRCUIT
BREAKER SENSOR.
A. Turn the Engine Control Sw itch (ECS) to STOP.
B. Locate the wire that is connecting pin 25 of the
GSC+P to the terminal CBR-9 of the Circuit
Breaker relay (C BR). Remove this wire at terminal
CBR-9 of the Circuit Breaker Relay (CBR) only.
Pin25ofGSC+Pwillremainconnectedtothe
wire.
C. Use a cable probe to measure the voltage at pin
25 of the GSC+P.
Expected Result:
The voltage should measure 10.5 ± 1 DCV.
Results:
•
OK – The voltage is 10.5 ± 1 DCV. Proceed to
Test S t e p 2.
•
NOT OK – The voltage is not within the correct
range.
Repair: The GSC+P may have failed. It is u nlike ly
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set)-Replace”.
STOP.
Test Step 2. CHECK THE FUNCTION OF
THE INPUT OF THE CIRCUIT BREAKER
SENSOR.
A. The wire that is connecting pin 25 of the GS C +P
and terminal CBR-9 of the Circuit Breaker relay
(CBR) remains disconnected.
B. Start the engine. Adjust the engine speed so the
generator frequency is more than 0.2 Hz of the
frequency of the bus.
C. Perform the Manual paralleling function. Refer to
Systems Operation, “Synchronization Sequence
Of Operation”.
D. Ensure that the synchroscope is present on the
lower display of the GSC+P .
E. Touch the loose end of the wire of pin 25 of the
GSC+P to “BATT-”.
Expected Result:
After two seconds, the CID 1167 FMI 4 should be
active.
Results:
•
OK – The GSC+P issues the diagnostic.