KENR8601 145
Troubleshooting Section
The possible cause of a CID 1038 FMI 04 is a short
from the output signal of the “Speed Adjust 1” to the
negative battery terminal.
A CID 1038 FMI 04 is detected when the GSC+P is
NOT activating the output of the “Speed Adjust 1”.
The GSC+P treats a CID 1038 FMI 04 as an alarm
fault. The synchronization process will be stopped
until the diagnostic code is cleared and the diagnostic
code is corrected.
Te st Step 1. CHECK THE INACTIVE
VOLTAGE LEVEL OF THE OUTPUT OF
THE “SPEED ADJUST 1”.
A. Turn the Engine Control Sw itch (ECS) to STOP.
B. Locate the wire that is connecting pin 27 of the
GSC+P to terminal 24 of the Load Share Module
(LSM) only. Remove this wire at terminal 24 of
the LSM only. Pin 27 of the GSC+P will remain
connected to the wire.
C. Useacableprobetomeasurethevoltageonpin
27 of GSC+P.
Expected Result:
The voltage should measure 0.0 ± 1.0 DCV.
Results:
•
OK – The voltage level is 0.0 ± 1.0 DCV. Proceed
to Test Step 2.
•
NOT OK – The voltage level is below the correct
range or the voltage level is above the correct
range.
Repair: The GSC+P may have failed. It is unlikely
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set) - Replace”.
STOP.
Te st Step 2. CHECK THE ACTIVE
VOLTAGE LEVELS OF THE OUTPUT OF
THE “SPEED ADJUST 1”.
A. The wire that is connecting pin “27” of the GSC+P
and terminal 24 of the LSM remains disconnected.
B. Start the engine. Adjust the engine speed so the
frequency is 1.0 Hz higher than the frequency of
the bus .
C. Perform the Automatic paralleling function.
If necessary, refer to Sy stems Operation,
“Synchronization Tuning Procedur”.
D. Allow the voltage to stabilize. Use a cable probe
to measure the voltage on pin 27 of GSC+P.
Expected Result:
The voltage should measure −5.0 ± 1.0 DCV.
Results:
•
OK – The voltage level is −5.0 ± 1.0 DCV. Proceed
to Test Step 3.
•
NOT OK – The voltage is above or the voltage is
below the correct voltage.
Repair: The GSC+P may have failed. It is u nlike ly
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set)-Replace”.
STOP.
Tes t Step 3. CHECK THE ACTIVE
VOLTAGE LEVELS OF THE OUTPUT OF
THE “SPEED ADJUST 1”.
A. The wire that is connecting pin 27 of the GS C +P
and terminal 24 of the LSM remains disconnected.
B. Start the engine. Adjust the engine speed so that
the frequency is 1.0 Hz lower than the frequency
of the frequency of the bus .
C. Perform the Automatic paralleling function.
If necessary, refer to Systems Operation,
“Synchronization Tuning Procedure”.
D. Allow the voltage to stabilize. Use a cable probe
to measure the voltage on pin 27 of GSC+P.
Expected Result:
The voltage should measure +5.0 ± 1.0 DCV.
Results:
•
OK – The voltage level is +5.0 ± 1.0 DCV.
Repair: The GSC+P is operating correctly, and
the problem is in the wiring or the component that
is connected to the output of the “Speed Adjust
1”. Use the F MI information and use the System
Schematic of the “Speed Adjust 1” to find the exact
cause of the fault.
STOP.
•
NOT OK – The voltage is above or the voltage is
below the correct voltage.