168 KENR8601
Testing and Adjusting Section
i02900007
EMCP Electronic Control (AC
Transformer Box) - Replace
SMCS Code: 1409-510
g00436522
Illustration 93
AC Transformer Box + (ATB+)
Replacement Procedure
1. Shut down the engine. Remove the positive lead
wire from the battery.
2. Make sure that all wires at the terminal strip of the
ATB+ are marked with the respective termination
point. During reassembly, these wires must be
reattached to the correct terminal. Remove all
external wires from the terminal strip.
3. Disconnect ATB+ from the harness connector.
4. Remove all mounting nuts and mounting screws
that fasten the ATB+ to the subpanel. R emove
the ATB+.
5. Place the new ATB+ in the subpanel. Install the
mounting nuts and mounting screws. Tighten the
mounting nuts and mounting screws.
6. Reconnect the harness connector to the ATB+.
Reconnect all the wires to the terminal strip that
were removed. Reconnect the positive lead wire
to the battery. If necessary, refer to the Generator
Set Wirin g Diagram in Tes tin g And Adjusting,
“Schematics and Wiring Diagrams”.
7. Program the bar code (calibration value) for
the voltmeter/ammeter into the GSC+. Refer
to Syst em Op eration, “Voltmeter/Ammeter
Programming OP8”.
8. If the generator set is operating in parallel with
another generator set and the voltmeter values
must match, then reprogram the AC offset. Refer
to System Operation, “AC Offset Adjustment
OP10”.
i02900009
EMCP Electronic Control (Bus
Transformer Box) - Replace
SMCS Code: 1409-510
g006032
88
Illustration 94
Bus Transformer Box + (BTB+)
Replace
ment Procedure
1. Shut down the engine. Remove the positive lead
wire fro
m the battery.
2. Make sure that all wires at the terminal strip of the
BTB+ are
marked with the respective termination
point. During reassembly, these wires must be
reattached to the correct terminal. Remove all
extern
al wires from the terminal strip.