KENR8601 171
Testing and Adjusting Section
2. Make sure that all w ires at the terminal strips
of the relay module (1) are marked with the
respective termination point. During reassembly
these wires must be reattached to the correct
terminal. Remove all wires from the terminals and
posts of relay module (1).
3. Remove ten screws (2) that fasten relay module
(1) to the GSC+P.
4. Be aware that O-ring seal (5) exists. Partially
separate relay module (1) from the GSC+P.
Carefully disconnect cable clamp and cable
connector (6) from relay module (1).
On the PC board of the original relay m odule and
the replacement relay module, check that the
small jumper block (near the ribbon cable) is the
same. Ref er to Testing And Adjusting, “AC Volta ge
Range - Adjust”.
5. Replace desiccant package (4) with the new
desiccant package and tape that is included with
the replacement relay module. Attach the new
desiccant package in the same manner as the
one removed.
Note: Do not remove the new desiccant package
from the protective container until immediately
before it is in stalled into the GSC +P. Installin g the
replacement relay module should take approximately
20 minutes. Longer periods of time will cause
the desiccant package to become saturated with
moisture particularly if in a humid environment.
6. Install new O-ring seal (5) in the groove of relay
module (1). Make sure that O-ring seal (5) is
seated properly. Align and reconnect cable
connector (6) to the relay module (1). Install the
cable clamp.
7. Place relay module (1) on the GSC+P. Check
that O-ring (5) remains seated. Align the screw
holes of relay module (1) and the GSC+P. Install
and t ighten ten screws (2) to 1.70 ± 0.25 N·m
(15±2lbin).
8. Reconnect all the wires to the terminals of the
relay module that were removed. Reconnect the
positive lead wire to the battery. If necessary,
Refer to the Generator Set Wiring Diagram in
Testing And Adjusting, “Schematics And Wiring
Diagrams”.
i02900024
EMCP Electronic Control
(Generator Set) - Replace
SMCS Code: 4490-510
Replacement Procedure
1. The new GSC+P must be reprogrammed after
the new GSC+P is installed. If the GSC+P that is
being replaced is functional, then make a note of
the following items: value of the hour meter, all
engine setpoints, and any spare inputs/outputs.
Refer to System Operation, “Engine/Generator
Setpoint Viewing OP2-0” and System Operation,
“Protective Relayin g Setpoint Viewing OP2-1”.
2. Shut down the engine. Remove the positive lead
wire from the batter y.
3. Remove the harness connector from the GSC+P.
A 4 mm hex wrench is required to turn the
fastening screw.
4. Make sure that all wires at the terminal strips are
marked with the respective terminal location for
reassembly. Remove all wires from the terminals
and from the posts of the relay module.
5. Remove the six nuts that fasten the GSC+P to the
front panel. Remove the GSC+P.
6. Place the new GSC+P in the front panel. Install
the six nuts. Tighten the nuts.
7. Reconnect the harness connector to the GSC+P.
Reconnect all the wires to the terminals of the
relay module that were removed. Reconnect the
positive lead wire to the battery. If necessary, refer
to the Generator Set Wiring Diagram Testing And
Adjusting, “Schematics And Wiring Diagrams”.
8. Reprogram the setpoints, the spare inputs/outputs,
the hour meter, the voltmeter/ammeter and the
AC offset adjustment. Refer to System Operation,
“Service Mode”. Use the values from the original
GSC+P. Refer to Step 1.