144 KENR8601
Troubleshooting Section
Repair: The GSC+P may have failed. It is unlikely
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set) - Replace”.
STOP.
Te st Step 2. CHECK THE ACTIVE
VOLTAGE LEVELS OF THE OUTPUT OF
THE “SPEED ADJUST 1”.
A. The wire that is connecting pin 27 of the
GSC+P and the terminal 24 of the LSM remains
disconnected.
B. Start the engine. Adjust the engine speed so the
frequency is 1.0 Hz higher than the frequency of
the bus .
C. Perform the Automatic paralleling function.
If necessary, refer to Sy stems Operation,
“Synchronization Tuning Procedure”.
D. Allow the voltage to stabilize. Use a cable probe
to measure the voltage on pin 27 of GSC+P.
Expected Result:
The voltage should measure −5.0 ± 1.0 DCV.
Results:
•
OK – The voltage level is −5.0 ± 1.0 DCV. Proceed
to Test Step 3.
•
NOT OK – The voltage is above or the voltage is
below the correct voltage.
Repair: The GSC+P may have failed. It is unlikely
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set) - Replace”.
STOP.
Te st Step 3. CHECK THE ACTIVE
VOLTAGE LEVELS OF THE OUTPUT OF
THE “SPEED ADJUST 1”.
A. The wire that is connecting pin 2 7 of the GSC+P
and terminal 24 of the LSM remains disconnected.
B. Start the engine. Adjust the engine speed so that
the frequency is 1.0 Hz lower than the frequency
of the frequency of the bus .
C. Perform the Automatic paralleling function.
If necessary, refer to Systems Operation,
“Synchronization Tuning Procedure”.
D. Allow the voltage to stabilize. Use a cable probe
to measure the voltage on pin 27 of GSC+P.
Expected Result:
The voltage should measure +5.0 ± 1.0 DCV.
Results:
•
OK – The voltage level is +5.0 ± 1.0 DCV.
Repair: The GSC+P is operating correctly, and
the problem is in the wiring or the component that
is connected to the output of the “Speed Adjust
1”. Use the F MI information and use the System
Schematic of the “Speed Adjust 1” to find the exact
cause of the fault.
STOP.
•
NOT OK – The voltage is above or the voltage is
below the correct voltage.
Repair: The GSC+P may have failed. It is u nlike ly
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set)-Replace”.
STOP.
i02890866
GSC CID 1038 - FMI 04
SMCS Code: 1264-035
Conditions Which Generate This Code:
The output of the “Speed Adjust 1” provides
an analog signal that is being used to vary the
engine speed in order to match the phase of the
generator to the phase o f the bus. The full output
voltage is approximately −5.0to+5.0DCV.Ifthe
synchronization is disabled, the output will be 0.0 ±
0.5 DCV.
Note: Setpoint P308 must be set to a value that is
greater than zero in order for this proced ure to be
completed. This se tpointcanbeavaluefrom0to
100. The factory default is 50. Refer to Systems
Operation, “Parallel Setpoint Programming” for more
information.