KENR8601 149
Troubleshooting Section
Expected Result:
The voltage of pin 29 of the GSC+P s hould measure
0.0 ± 0.5 DCV.
Results:
•
OK – The voltage is 0.0 ± 0.5 DCV. Proceed to
Test Step 3.
•
NOT OK – T he voltage is incorrect.
Repair: The GSC+P may have failed. It is unlikely
that the GSC+P has failed. Exit this procedure and
perform this entire procedure again. If the problem
remains, replace the GSC+P. Refer to Testing And
Adjusting, “EMCP Electronic Control (Generator
Set) - Replace”.
STOP.
Te st Step 3. CHECK THE F UNCTION OF
THE BUS RELAY.
A. Carefully reconnect any power wires of the DBR
that may have previously been removed.
B. Ens ure that the bus is live.
C. Use a cable probe to measure the voltage at pin
29 of the GSC+P.
Expected Result:
The voltage should measure 10.5 ± 1.0 DCV.
Results:
•
OK – The voltage is 10.5 ± 1.0 DCV.
Repair: The GSC+P is functioning p roperly. The
problem is in the wiring or the component that is
connected to the input of the dead bus sensor of
theGSC+P.UsetheFMIinformationandtheDead
Bus Sensor input System Schematic to find the
exact cause of the diagnostic code.
STOP.
•
NOT OK – T he voltage is incorrect.
Repair: The GSC+P has faile d. Replace t he
GSC+P. Refer to Tes tin g and Ad jus tin g, “EM PC
Electronic Control (Generator Set) - Replace”.
STOP.
i02891171
GSC CID 1169 - FMI 02
SMCS Code: 1409-035
Conditions Which Generate This Code:
The “ATB+” reduces the AC voltages to neutral
voltages and phase currents from the generator to
usable signal levels for the GSC+P. The GSC+P
uses these reduced signals for the following reasons:
metering AC power, calculating the phase angle with
the bus, and detecting the phase sequence of the
generator. The phase sequence of the generator is
the following order: Phase A, Phase B, and Phase C.
The possible cause of a CID 1169 FMI 02 is a short
between two or three phases of the output of the
ATB+ . The phase angle between any two phases is
120°. The short will make the phase angle between
any two phases unequal to 120°.
The GSC+P treats a CID 1169 FMI 02 as an alarm
fault. The GSC+P will stop the “Speed Adjust 1” and
Close Breaker functions b y the GSC+P. T h e CID
1169 FMI 02 will not affect any other synchronization
processes.
CHECK THE LINE-TO-LINE VOLTAGES.
A. Start the engine.
B. Record the line to line voltage on the upper display
of the GSC+P.
Expected Result:
The line-to -line voltages should be equal within ±5%.
The voltages should also be within a reasonable
value of the rated voltage of the genset.
Results:
•
OK – The line-to-line voltages are equal w ithin
±5% and the voltages are within a reasonable
value of the rated voltage of the genset.
Repair: The ATB+ has failed. Replac e the AT B+.
See Testing and Adjusting, “EMPC Electronic
Control (AC Transformer Box) - Replace”.
STOP.
•
NOT OK – The voltages are not correct.