KENR8601 151
Troubleshooting Section
Expected Result:
The voltage between “B1” and “B2” of the generator
isthesameasthelinetolinevoltage.
Note: If external potential transformers for medium
and high voltage generators are present, the voltage
will be the same as the secondary of the potential
transformer.
Results:
•
OK – The voltage is correct. Proceed to Test Step
4.
•
NOT OK – The voltage is not correct. Proceed to
Test Step 3.
Te st Step 3. CHECK THE BTB+ INPUT
CIRCUIT
A. Stop the engine. Turn the ECS to “STOP”. Ensure
that no other source is connected to the bus.
B. Disconnect the wires labelled “E486” and “E488”
from the BTB+ terminals.
C. Measure the resist ance between “ E486” and
“E488” and on the BTB+.
Expected Result:
Theresistanceshouldbe2140ohms±400ohms.
Results:
•
OK – The resistance is correct. There is a failure
in the wiring between the BTB+ and the generator.
Repair: Use the System Schematic for the BTB+
and the AC schematic in order to troubleshoot the
wiring and find the exact cause of the diagnostic
code. Refer to Testing And Adjusting, “Schematics
And Wiring Diagrams”.
STOP.
•
NOT OK – The resistance is not correct. BTB+
has failed.
Repair: The BTB+ has failed. Replace the BTB+.
Refer to Testing And A djusting, “EMCP Electronic
Control (Bus Transformer Box) - Replace”.
STOP.
Te st Step 4. CHECK VOLTAGE ON GSC+P
INPUT
A. Stop the engine.
B. Install cable probes on the GSC+P pins 17 and 18
of the 40-pin connector.
C. Start the engine. The engine is running at rated
speed.
D. Measure the voltage between pin 17 and pin 18 of
the GSC+P connector.
Expected Result:
The voltage should be equal to the voltage measured
in Test Step 2 divided by 15 ± 2% (14.7 to 15.3).
Results:
•
OK – The voltag e is correc t. CID 1170 FMI 2 is still
active. The GSC+P may have failed.
Repair: It is unlikely that the GSC+P has fa iled. Exit
this procedure and perform this entire procedure
again. If the result is the same, replace the GSC+P.
Refer to Testing and Adjusting, “EMCP Electronic
Control(GeneratorSet)-Replace”.
STOP.
•
NOT OK – The voltage is not correct. P roceed to
Test S t e p 5.
Tes t Step 5. CHECK VOLTAGE ON BTB+
OUTPUT
A. Stop the engine.
B. Insta ll cable probes bet w een pin A and pin B of
three terminal connector “J1” on the BTB+.
C. Start the engine and run the engine at rated speed.
D. Measure the voltage between pin A and pin B of
“J1”.
Expected Result:
The voltage should be equal to the voltage measured
in Test Step 2 divided by 15 ± 2% (14.7 to 15.3).
Results:
•
OK – T h e voltage is correct. There is a wiring
failure between the GSC+P and the BTB+.
Repair: Use the S yst em Schem a tic for t he BTB+
and the AC schematic in order to troubleshoot the
wiring and find the exact cause of the diagnostic
code. Testing And Adjusting, “Schematics And
Wiring Diagrams”.
STOP.
•
NOT OK – The voltage is not correct. P roceed to
Test S t e p 6.