
212
Maintenance and Lubrication Section (Pipelayer Attachment Kit) WEBM1000
Maintenance Interval Schedule (MIS)
Maintenance Interval Schedule
(MIS)
Ensure that all safety information, warnings, and
instructions are read and understood before any
operation or any maintenance procedures are
performed. The user is responsible for the
performance of maintenance, including all
adjustments, the use of proper lubricants, fluids,
filters, and the replacement of components due to
normal wear and aging. Failure to adhere to proper
maintenance intervals and procedures may result in
diminished performance of the product and/or
accelerated wear of components. Use mileage, fuel
consumption, service hours, or calendar time,
WHICH EVER OCCURS FIRST, in order to determine
the maintenance intervals. Products that operate in
severe operating conditions may require more
frequent maintenance.
Note: Bef
ore each consecutive interval is
per
formed, all maintenance from the previous
interval must be performed. Perform the following
servicing at EVERY interval they occur; for example,
the 10 hour and 50 hour service are also performed
at the 200 hour interval, etc.
When Required
Boom Line – Install .............................................. 214
Hook Load Line – Install
...................................... 220
Every 10 Service Hours or Daily
Controls for proper operation of boom and hook–
Check
Boom Stop operation – Check, adjust if
required
.............................................................. 214
Boom Pivot Pins – Lubricate
................................ 217
Counterweight Cylinder Bearings – Lubricate
..... 218
Counterweight Hinge Pins – Lubricate
................ 218
Fairlead Sheave – Lubricate
................................ 219
Hook and Wire Cable (Boom and Hook lines) – In-
spect
.................................................................. 219
Hydraulic System Oil Level – Check
.................... 225
Hoses and fittings for leaks – Check
Sheave Block Bearings – Lubricate
..................... 226
Pipelayer structures and components for loose bolts,
cracks, damag
e, etc. – Inspect
Inspect the hook for any distortion, bends, twists, etc.
In
spect
the hook for any wear, cracks, nicks, or
gouges. Refer to American National Standard Insti-
tute ANSI/ASME B30.14
Blocks, and yokes for wear or damage – Inspect
Ensure that area between tractor tracks and pipelay-
er-tractor attachment structures are free from dirt,
debris,
ice, snow
, etc. – Inspect
Every 50 Service Hours or Weekly
Thoroughly check Boom Stop system operation and
adjustment, lubricate boom stop valve roller and ac-
tuator.
Lightly lubricate wire rope with recommended engine
or hydraulic oil.
Every 500 Service Hours
Hydraulic System Oil Sample - Obtain ................ 225
Every 500 Service Hours or 3
Months
Hydraulic System Oil Filter – Replace ................. 223
Hydraulic System Case Drain Filter - Replace
Every 2000 Service Hours or 1 Year
Hydraulic System Oil - Change ........................... 221
Accumulator
This system contains high pressure gas. Failure
to follow the instructions and warnings could
cause an explosion, resulting in possible injury
or death. Do not expose to fire. Do not weld. Do
not drill. Do not remove any hydraulic system
lines, taps or parts until pressure has been
relieved. Relieve pressure before discharging.
See Operation and Maintenance Manual
"Accumulator - Relieving Charge". See Operation
and Maintenance Manual "Accumulator" for
charging and discharging. See your Dealer for
tools and detailed information.
Accumulator must be charged with dry nitrogen (N2)
gas by qualified personnel only. The accumulator
must be at the same temperature as the surrounding
air before being checked or charged. Charge the
accumulator depending on the ambient air
temperature according to the table below. Access
the accumulator to charge from the rear of the
tractor, above the tow-winch drive.